Winchester, MA
Winchester Hospital Parking Garage
Scope/Solutions
The parking garage at Winchester Hospital was constructed in 1982 and is used heavily during the day by patients and visitors. The concrete structure, primarily comprising precast double-tees, beams, and columns, exhibited cracking and spalling. SGH investigated the structure’s condition and designed repairs to extend its useful life.
SGH determined the structure required remedial work to address corrosion‑related deterioration and designed repairs, including:
- Full-depth repairs to precast double tee flanges
- Partial-depth repairs to precast inverted tee beams supporting the double-tees, precast concrete columns, and cast-in-place concrete curbs
- Repairs to deteriorated plumbing components
We helped Winchester Hospital coordinate scheduling and implement the project in phases, allowing the garage to remain open during the work.
Project Summary
Solutions
Repair & Rehabilitation
Services
Structures
Markets
Health Care & Life Sciences | Infrastructure & Transportation
Client(s)
Winchester Hospital
Specialized Capabilities
Repair & Strengthening
Key team members

Additional Projects
Northeast
238 Main Street
SGH provided building enclosure commissioning services for the building at 238 Main Street, featuring high-performance unitized curtain wall systems and existing mass masonry walls.
Northeast
350 Water Street
Cambridge Crossing is a forty-three-acre, mixed-use development adjacent to Kendall Square and served by the new MBTA Green Line extension. The new building on Parcel G at 350 Water Street houses twelve levels for life science office and laboratory space.