Winchester, MA
Winchester Hospital Parking Garage
Scope/Solutions
The parking garage at Winchester Hospital was constructed in 1982 and is used heavily during the day by patients and visitors. The concrete structure, primarily comprising precast double-tees, beams, and columns, exhibited cracking and spalling. SGH investigated the structure’s condition and designed repairs to extend its useful life.
SGH determined the structure required remedial work to address corrosion‑related deterioration and designed repairs, including:
- Full-depth repairs to precast double tee flanges
- Partial-depth repairs to precast inverted tee beams supporting the double-tees, precast concrete columns, and cast-in-place concrete curbs
- Repairs to deteriorated plumbing components
We helped Winchester Hospital coordinate scheduling and implement the project in phases, allowing the garage to remain open during the work.
Project Summary
Solutions
Repair & Rehabilitation
Services
Structures
Markets
Health Care & Life Sciences | Infrastructure & Transportation
Client(s)
Winchester Hospital
Specialized Capabilities
Repair & Strengthening
Key team members

Additional Projects
Northeast
University of Massachusetts Memorial Medical Center
The granite-clad Medical Center building, built in the 1970s, is nine stories tall. SGH led an investigation of the stone cladding when the owner observed bowing, cracking, and displacement of the cladding.
Northeast
Boynton Yards, 808 Windsor
The master plan for Boynton Yards, a 1.8 million sq ft mixed-use development, includes four laboratory and office buildings, more than 400 residences, a cultural arts center, and public green space. SGH provided building enclosure consulting and commissioning services for the project.