Winchester, MA
Winchester Hospital Parking Garage
Scope/Solutions
The parking garage at Winchester Hospital was constructed in 1982 and is used heavily during the day by patients and visitors. The concrete structure, primarily comprising precast double-tees, beams, and columns, exhibited cracking and spalling. SGH investigated the structure’s condition and designed repairs to extend its useful life.
SGH determined the structure required remedial work to address corrosion‑related deterioration and designed repairs, including:
- Full-depth repairs to precast double tee flanges
- Partial-depth repairs to precast inverted tee beams supporting the double-tees, precast concrete columns, and cast-in-place concrete curbs
- Repairs to deteriorated plumbing components
We helped Winchester Hospital coordinate scheduling and implement the project in phases, allowing the garage to remain open during the work.
Project Summary
Solutions
Repair & Rehabilitation
Services
Structures
Markets
Health Care & Life Sciences | Infrastructure & Transportation
Client(s)
Winchester Hospital
Specialized Capabilities
Repair & Strengthening
Key team members
Additional Projects
Northeast
Boston Center for Rehabilitative and Subacute Care
The Boston Center for Rehabilitation and Subacute Care was built in two phases, with the north wing dating from 1953 and the south wing dating from 1980. SGH completed an assessment of the facades and structural frame as part of the team led by Steffian Bradley Architects.
Northeast
Milford Regional Medical Center Meehan Family Pavilion
The Meehan Family Pavilion, an 88,000 sq ft addition, is Milford Regional Medical Center’s largest expansion to date. SGH designed the structure for the new addition.