On 9 March 2002, a 100 ft long, suspended scaffold platform fell from the 42nd floor of the John Hancock Center. SGH investigated the causes of the failure.
Chicago, IL
Scope/Solutions
The tenant that occupied Floors 42 and 43 in Willis Tower wanted to expand onto Floor 41. SGH served as the structural engineer for the Floor 41 renovation, which included evaluating the existing 1970s steel-framed structure, and designing structural modifications to accommodate programmatic changes and incorporate new stairs between Floors 41 and 43.
SGH performed structural analyses to evaluate the proposed renovations and designed structural modifications and new components, including: