The four-story building at 1079 Commonwealth Avenue is a concrete structure constructed in the early 20th century for the Packard Motor Car Company. In the mid-20th century, the building was converted to apartments, serving as an early example of many adaptive reuse projects in Boston. The facade was reclad with EIFS in the 1980s and remained largely unchanged until a recent project to update the building. SGH provided structural and building enclosure engineering services for the project, which included replacing the roof, recladding the facade, and repairing deteriorated concrete components in the two-level parking garage.

Our work began with a condition assessment of the garage, facade, balconies, and roofs, and included visually surveying the structure and conducting field and laboratory testing to identify damage and deterioration. We developed rehabilitation options for the owner’s consideration, ranging from localized repairs, to a full facade reclad to replacing the building.

SGH served as the structural and building enclosure engineer of record for the renovation and developed a plan to repair existing damage, extend the building’s useful life, and update the facade’s appearance and performance. We coordinated with the property manager to phase the work to help them meet their budget and minimize disruption. The project included:

  • Reconstructing exterior walls and recladding the building with composite metal panels
  • Replacing the windows with flanged curtain wall assemblies
  • Repairing concrete balconies, applying a new waterproofing coating, and installing new railings
  • Replacing the existing low-slope roofs and reconstructing the parapets to meet current code requirements
  • Coordinating the roof replacement with the installation of new rooftop mechanical equipment and adding roof anchors for a facade access system
  • Repairing cracks and deteriorated concrete components in the below-grade concrete parking structure and applying a traffic-bearing waterproofing coating

SGH provided construction administration services, including reviewing submittals and applications for payment, visiting the site to observe ongoing work, and helping the project team address field conditions.

Project Summary

Icon: completion-date

2024

Completion Date
Icon: construction-value

50M

Construction Value
Icon: building-size

300K

Project Size
Solutions
Repair & Rehabilitation
Services
Structures | Building Enclosures | Applied Science & Research
Markets
Residential
Client(s)
The Hamilton Company

Key team members

Christopher Grey
Principal
John Porter
Senior Principal

Additional Projects

Northeast

ATRIUM AT SUMNER

Looking to fill a need for affordable senior housing, the New York City Housing Authority constructed the Atrium at Sumner on the existing Sumner Houses property in Brooklyn's Bedford-Stuyvesant neighborhood. SGH provided fire life safety services for the project.
Explore
Northeast

Post-Hurricane Sandy Evaluations

On 29 October 2012, Hurricane Sandy made landfall along the eastern United States seaboard, bringing high winds and a tidal surge, and causing billions of dollars in damage to our built environment. Some of the worst damage was reported in the coastal areas of New York and New Jersey.
Explore