New York, NY
New York-Presbyterian, Statement of Conditions Assessments
Scope/Solutions
New York-Presbyterian (NYP) operates seven campuses and three regional hospitals in the New York City metropolitan area. On an as-needed basis and for specific projects, SGH assists NYP by evaluating fire life safety conditions at their properties. One of our assignments included services to conduct Statement of Conditions assessments to prepare NYP for The Joint Commission inspection.
SGH inspected 2.3 million sq ft of above- and below-ceiling conditions at three NYP campuses: Westchester and Brooklyn Methodist hospitals, and Westchester Behavioral Health center. Highlights of our work include:
- Comparing the facilities’ drawings to the existing conditions to determine if any of the drawings are outdated
- Identifying items not meeting NFPA 101: Life Safety Code and New York City or New York State Building Code, documenting our observations and the relevant code references, and providing options for addressing deficiencies, such as:
- Means of egress. Moving wheeled devices to appropriate storage locations to keep exits accessible, keeping exit stairs free of stored items, and keeping fire doors closed and making sure they are self-closing and latching
- Firestopping. Firestopping ducts and penetrations in fire barriers and smoke barriers
- Fireproofing. Fully encapsulating structural steel and beam clamps in fireproofing
- Sprinklers. Ensuring appropriate sprinkler spacing in areas where drawings specify fully sprinklered, keeping storage from blocking sprinklers, keeping control valves in the open position
- Fire alarms. Maintaining clear access to initiating devices, providing notification appliances throughout corridors, and educating staff on evacuation procedures
- Utilizing Archibus, an integrated workplace management system that allows NYP to assign work orders and track corrective actions
Project Summary
Solutions
Evaluation
Services
Performance & Code Consulting
Markets
Health Care & Life Sciences
Client(s)
New York-Presbyterian
Specialized Capabilities
Fire Life Safety & Accessibility
Key team members
David Jacoby
Managing Principal, Engineering Mechanics and Infrastructure, Fire Engineering
Additional Projects
Northeast
Boynton Yards, 808 Windsor
The master plan for Boynton Yards, a 1.8 million sq ft mixed-use development, includes four laboratory and office buildings, more than 400 residences, a cultural arts center, and public green space. SGH provided building enclosure consulting and commissioning services for the project.
Northeast
450 Water Street
Formerly a railyard adjacent to Kendall Square, Cambridge Crossing is a forty‑three-acre mixed-use development. SGH consulted on the building enclosure design for 450 Water Street and the building on Parcel G at 350 Water Street that serve together as a flagship campus location for Sanofi.