San Francisco, CA

50 Fremont Center

Scope/Solutions

Designed in 1980 by Skidmore, Owings & Merrill, 50 Fremont Center is a forty-three-story office tower. The building’s lateral system comprises steel moment-resisting frames (SMRF) with flange welded/web-bolted connections, which were included as prescriptive details in the Uniform Building Code at the time of design and construction. The 1994 Northridge and 1995 Kobe earthquakes exposed weaknesses in this connection type and subsequent research identified them as prone to brittle fracture based on low ductility weld material, poor detailing, and construction issues. The owner wanted to understand the building’s susceptibility to damage or collapse from large earthquakes on nearby faults. Working with Partner Engineering and Science, SGH evaluated the structure’s behavior under seismic loads.

SGH’s analysis focused on the building’s behavior during seismic events characteristic of the San Andreas Fault and the Hayward Fault. Highlights of our work include:

  • Reviewing available structural and architectural drawings
  • Visiting the site to compare the existing building structure to the design drawings and to document the condition and configuration of representative steel connections
  • Performing linear elastic analyses using site-specific accelerations from U.S. Geological Survey and evaluating performance per ASCE-41 criteria
  • Developing a nonlinear analysis model simulating fractured connections, column buckling, and other yielding elements to capture the building’s expected seismic performance up through collapse
  • Conducting nonlinear simulations using site-specific hazard response spectra and scaled earthquake time histories to predict the structure’s behavior
  • Recommending retrofit options, including adding viscous dampers to improve the structure’s seismic performance

Project Summary

Icon: completion-date

2020

Completion Date
Icon: building-size

850K

Project Size
Solutions
Repair & Rehabilitation
Services
Structures | Performance & Code Consulting
Markets
Commercial
Client(s)
Partner Engineering and Science
Specialized Capabilities
Seismic Engineering | Risk & Resilience

Key team members

Smiling middle-aged man with salt-and-pepper hair and goatee wearing a gray suit jacket and lavender shirt
Paul Cordova
Associate Principal

Additional Projects

West

The Avery, Transbay Block 8, 400-450 Folsom Street

Located on Block 8 in the Transbay Redevelopment District, the mixed-use development at 400 Folsom Street includes a fifty‑five‑story tower and two low-rise buildings designed by the executive architecture team of Office for Metropolitan Architecture and Fougeron Architecture.
Explore
West

The Grand LA

The Grand LA includes retail and restaurant space, a forty-five-story residential tower with 500 units, a twenty-story hotel with 309 rooms plus event space, and outdoor gathering areas. SGH is providing fire life safety and accessibility consulting services for the project.
Explore