Although one building, the 245-bed Jacobs Medical Center functions as three medical specialty centers— housing inpatient services for high-risk obstetrics and neonatal care, cancer care, and advanced surgical care. The building’s...
The Massachusetts Department of Mental Health wanted to expand their treatment resources with a new hospital facility. Supporting numerous functions, the building features a variety of floor finishes on concrete slabs. SGH consulted on the...
Shortly after construction, the hospital reported rutting and liquid emanating from joints in sheet vinyl flooring, wet and soft adhesive under carpet tile and sheet vinyl, and cracking and bulging of vinyl composition tile (VCT) installed over a...
Naval Hospital Camp Pendleton needed a new hospital to facilitate expansion and advancing medical and technical services. To promote healing, the new building features calming interiors, a sunlit atrium, and central courtyard. SGH assisted HKS...
Immortalized by the Eagles as Hotel California, the former resort is the namesake for the song and the rehabilitation facility where the lead singer wrote the lyrics during his treatment there. Constructed in the 1920s as the Norconian Resort,...
Expanding a commitment to integrative medicine, the new five-story building at the University of California San Francisco (UCSF) Mount Zion Campus houses the Osher Center for Integrative Medicine and the UCSF Division of General and Internal...
Southcoast Hospitals Group was looking to update Charlton Memorial Hospital, which was constructed in the early 1980s. They undertook a project to improve energy efficiency, reduce air leakage through the enclosure, and update the hospital’...
During the 2008 excavation for the new North Tower, the adjacent five-story, brick masonry building (Building 3) suddenly settled about 1.5 in. This movement caused significant damage to Building 3, which was supported on shallow...
The granite-clad Medical Center building, built in the 1970s, is nine stories tall. The building houses the university teaching hospital, the medical school, and clinical research laboratories. SGH led an investigation of the stone...
The Boston Center for Rehabilitation and Subacute Care was built in two phases, with the north wing dating from 1953 and the south wing dating from 1980. Deteriorated and aged building systems, active leakage, and visible masonry and...