Boston, MA
Mercantile Wharf
Scope/Solutions
Adapted in the 1970s, the Mercantile Wharf Building now includes four levels of apartments over ground-floor retail space. SGH completed a condition assessment of the timber-framed and masonry bearing wall structure.
SGH surveyed exterior and interior masonry walls, wood framing, the framing’s bearing conditions on the walls, and the basement slab-on-grade.
After documenting damage and determining the causes of distress, we tabulated and categorized the conditions. To assist the property manager in their maintenance planning, SGH recommended remedial work, prioritized it as immediate or future repairs, and suggested long-term monitoring for certain items.
Project Summary
Solutions
Repair & Rehabilitation
Services
Structures
Markets
Commercial | Residential | Mixed-Use
Client(s)
Sullivan Properties, Inc.
Specialized Capabilities
Repair & Strengthening
Key team members


Additional Projects
Northeast
Yotel
Located at 65 Seaport Boulevard above the MBTA Silver Line, the YOTEL Boston is an eleven-story micro-room hotel. SGH consulted on the building enclosure design for the project.
Northeast
99 Summer Street Parking Garage
The parking garage, constructed with concrete slabs on metal deck supported by steel beams and columns, includes two below-grade levels under a twenty-story office building. SGH performed a condition assessment and designed repairs to extend the useful life of the parking structure.