Cambridge, MA
50 & 60 Binney Street
Scope/Solutions
Anchoring the eastern corner of the Alexandria Center at Kendall Square, 50 & 60 Binney Street offer 500,000 sq ft of rentable area for science and technology tenants and ground-level retail and restaurant space. The two towers feature stepped and curving curtain wall facades and large landscaped balconies on alternating floors. SGH consulted on the building enclosure for the project.
SGH consulted on the roofing and waterproofing design and also served as a secondary peer reviewer for the curtain wall and precast facade elements of the building. Highlights of our work include the following:
- Assisted with the design of below-grade waterproofing for the slurry wall foundation, plaza deck and terrace waterproofing, and roofing
- Reviewed the proposed design for curtain wall and brick masonry embedded in precast concrete wall panels and provided recommendations to improve performance
- Tested the freeze/thaw performance of brick panels and panel repairs
- Participated in design-assist meetings with the architect, contractor, and subcontractors
- Observed testing of a full-scale curtain wall mockup at third-party laboratory
- Provided construction administration services, including reviewing shop drawings and submittals to compare with the design intent, visiting the site to observe construction and compare with the project requirements, and overseeing performance testing for the roofing and waterproofing systems
- Performed on-site quality control air/water infiltration testing of the installed curtain wall assemblies
Project Summary
Solutions
New Construction
Services
Building Enclosures
Markets
Commercial | Health Care & Life Sciences | Mixed-Use
Client(s)
Spagnolo Gisness & Associates, Inc.
Specialized Capabilities
Facades & Glazing | Roofing & Waterproofing
Key team members

Additional Projects
Northeast
Prudential Gateway Center
Built in 1983 and 1987, Two and Three Gateway Center served as the headquarters of Prudential Real Estate. SGH utilized the results of wind tunnel testing to reduce the overall cost of the remedial design.
Northeast
303 Congress Street
The six-story, steel-moment framed building at 303 Congress Street was constructed in 1983. In 1995, SGH investigated foundation settlement that caused significant damage and resulted in immediate evacuation of the building.