Hyde Park, IL

Landmarks Illinois

Scope/Solutions

As part of the Preservation Easement Program, Landmarks Illinois oversees the preservation of properties with designated easement on their facades. Working for Landmarks Illinois, SGH evaluated the condition of landmarked facades and roofs in Hyde Park. The twenty-three residential buildings are managed by Antheus Capital Properties.

At each building, SGH completed a visual survey of the roofs and facades, assessed the condition, and documented visible distress and deterioration. We observed a variety of facade materials (brick, stone, terra-cotta, and wood), roofing materials (tile, low-slope membranes, and flashing from roof to facade parapets), and many other building components (chimneys, balconies, window and door fenestrations, and exterior stairs).

SGH summarized our observations in a report for each property, identifying critical items (e.g., loose or displaced components), issues requiring research, and general comments. Using the survey results, Landmarks Illinois notifies owners about items needing repairs to address life safety and maintenance, as well as to preserve the easement of the historic facades.

Landmarks Illinois retained us to perform yearly reviews of the same buildings and compare the conditions with our previous observations.

Project Summary

Solutions
Repair & Rehabilitation | Preservation
Services
Building Enclosures
Markets
Residential
Client(s)
Landmarks Illinois
Specialized Capabilities
Condition Assessments | Preservation

Key team members

Peter Babaian
Peter Babaian
Managing Principal, Building Technology, Chicago

Additional Projects

Midwest

4646 Broadway Lofts

Shortly after construction, occupants reported water leakage, condensation on window frames and glazing, and areas of uncomfortably warm or cool temperatures. SGH investigated the issues and developed repair concepts to address problems with the enclosure and mechanical systems.
Explore
Midwest

The Vue

The Vue at Creve Coeur is an eight-acre, three-building apartment complex completed in 2016. SGH investigated the alleged defects and designed repairs.
Explore