Waltham, MA

Sleeve Block Testing

Scope/Solutions

The unitized curtain wall units for a new high-rise building are fabricated with first anchors and sleeve blocks that attach the curtain wall to anchorage plates cast into the building structure. During construction, nail gun fasteners penetrated the sleeve blocks. The curtain wall fabricator required the contractor to test their capacity with the penetrations. SGH performed the testing to help the contractor determine whether or not the punctured sleeve blocks were structurally adequate.

SGH performed physical testing on samples of the aluminum sleeve blocks and fist anchors. We tested samples with and without penetrations so the project team could compare their capacity. Highlights of our work include:

  • Reviewing the testing procedures required by the curtain wall fabricator
  • Developing a test plan that met the requirements and was compatible with our laboratory, equipment, and instrumentation
  • Designing and machining a testing apparatus to hold the anchor and sleeve blocks in place at a specified angle to mimic the resultant force between the vertical design load and horizontal wind load
  • Performing tensile load testing with our universal test machine
  • Providing the project team with force and deflection measurements to compare the performance of samples with and without penetrations

Project Summary

Icon: completion-date

2023

Completion Date
Solutions
Repair & Rehabilitation
Services
Building Enclosures | Applied Science & Research
Markets
Commercial
Specialized Capabilities
Facades & Glazing | Physical Testing

Key team members

Norman Perkins
Director of Applied Science & Research
Melissa Roth
Applied Science & Research Center Manager

Additional Projects

Northeast

Twenty|20 at 20 Child Street

Leading the development at East Cambridge’s NorthPoint site, Twenty|20 brings 355 apartment units to the growing neighborhood. SGH consulted on the building enclosure design.
Explore
Northeast

Bangor Savings Bank Garage

Bangor Savings Bank was looking to consolidate their operations by constructing a new headquarters with a five-story office building and a four-story parking garage. SGH served as the prime consultant, structural engineer, and functional designer for the parking garage.
Explore