Bangor Savings Bank was looking to consolidate their operations by constructing a new headquarters with a five-story office building and a four-story parking garage along the Bangor waterfront. SGH served as the prime consultant, structural engineer, and functional designer for the parking garage with approximately 450 spaces and a rooftop solar array.

As the prime consultant for the parking garage, SGH coordinated the structural, architectural, functional, civil, mechanical/electrical/plumbing and fire protection, and performance & code consulting aspects of the design. We developed the functional layout of the parking garage, including the locations of striping, stair/elevator locations, parking access control equipment, and associated traffic islands within the garage.

SGH also served as structural engineer of record for the garage, which is cut into the side of a hill and includes a one-story, concrete retaining wall to facilitate entrances on multiple levels. We designed the cast-in-place concrete foundations, retaining walls, stair/elevator towers, and an exterior areaway to provide fresh air ventilation to the ground level. We also developed a conceptual roof structure design based on a proposed solar array layout for pricing purposes.

We provided construction administration services, including reviewing shop drawings and submittals, responding to contractor requests for information, and periodically visiting the site to observe ongoing construction.

Project Summary

Icon: completion-date

2019

Completion Date
Icon: construction-value

35M

Construction Value
Icon: award-winner

AWARD

Winner
Solutions
New Construction
Services
Markets
Commercial
Client(s)
Bangor Savings Bank

Key team members

Michael Bolduc
Associate Principal
Sal Capobianco
Senior Principal

Additional Projects

Northeast

Prudential Gateway Center

Built in 1983 and 1987, Two and Three Gateway Center served as the headquarters of Prudential Real Estate. SGH utilized the results of wind tunnel testing to reduce the overall cost of the remedial design.
Explore
Northeast

One Cambridge Place

The project, which would provide CDM with parking for 235 cars and 160,000 sq ft of office space, needed a compressed design and construction schedule. SGH designed the new nine-story structure in time to obtain building permit sixty days after the initiation of design.
Explore