West
Alameda Landing Wharf Rehabilitation
The wharf at Alameda Landing was originally built in the 1940s for the U.S. Navy's Fleet Industrial Supply Center. SGH served as engineer of record for the wharf rehabilitation.
Barranquilla, Colombia
Scope/Solutions
Sociedad Portuaria Regional de Barranquilla (SPRB) wanted to better understand the condition of their 1 km marginal wharf and retained SGH to evaluate the structural and geotechnical stability of the wharf during operations.
SGH reviewed historical drawings and inspection reports to identify the structural framing for each of the seven wharf segments. Each segment was constructed at a different time with a different configuration, but generally consists of a concrete deck supported on prestressed concrete piles with a concrete sheetpile bulkhead on the water side. Highlights of our assessment include:
Project Summary