16 Projects

The Arlington

Naples
,
FL
Project Contacts:

The Arlington is the first entirely new continuing care retirement community built in the Naples area in many years. Sited on a 39-acre, resort-style property, the central apartment building...

Vivante Phase II

Vivante Phase II

Costa Mesa
,
CA
Project Contacts:

Vivante is a multibuilding assisted living and memory care community in Orange County. With Phase II, Vivante adds 118 assisted and independent living residences and many new amenities to the...

Salt Processing Dome

Salt Processing Dome

Savage
,
MN
Project Contacts:

The salt processing dome, with an inside diameter of 173 ft and a dome peak of 65 ft, houses equipment for processing and packaging bulk rock salt for commercial sale. The shell structure was...

Millennium Tower, 301 Mission Street

Millennium Tower, 301 Mission Street

San Francisco
,
CA
Project Contacts:

With bedrock more than 200 ft below street level, the fifty-eight-story Millennium Tower, like most downtown high-rises, is founded on piles driven through soft, compressible clay soils deposited...

The Epiphany Palo Alto, CA

The Epiphany

Palo Alto
,
CA
Project Contacts:

The original Casa Olga building was an eight-story, reinforced concrete flat slab structure with reinforced masonry shear walls.  The building served as a convalescence home until new owners...

1101 Second Avenue

1101 Second Avenue

Seattle
,
WA
Project Contacts:

The concrete building at 1101 Second Avenue, originally developed in 1967 as the headquarters for Washington Mutual Savings Bank, was designed by the northwest modernist architect, Paul Thiry. ...

The Arroyo Walnut Creek

The Arroyo

Walnut Creek
,
CA
Project Contacts:

Hall Equities Group wanted a modern, luxury apartment building near downtown Walnut Creek, where building heights are limited unless the public votes to allow the development to exceed the...

R.O. Pickard Environmental Centre Expansion (ROPEC)

R.O. Pickard Environmental Centre Expansion (ROPEC)

Ottawa
,
ON
Project Contacts:

For the R.O. Pickard Environmental Centre digester expansion program, the owner's engineer envisioned two structurally-identical, modified, egg-shaped digesters founded on drilled piers extending...

U.S. Navy P-405 Bachelor Enlisted Quarters Parking Garage

U.S. Navy P-405 Bachelor Enlisted Quarters Parking Garage

San Diego
,
CA
Project Contacts:

The P-405 project consists of a multi-story Bachelor Enlisted Quarters and multi-story parking structure at Naval Base San Diego. The parking structure provides 800 parking spaces in six stories,...

Tank Service Life Estimate

Tank Service Life Estimate

Middle East
,
Saudi Arabia
Project Contacts:

 The tank, classified as an American Water Works Association (AWWA) D-110 Type I tank, is a strand-wound circular, prestressed concrete water tank with cast-in-place concrete tank walls clad in...

Pages