Miami Marine Stadium

Miami, FL

Client

City of Miami, FL
Friends of Miami Marine Stadium, Inc.

Completion

2012

Awards

2014 Modernism in America Award, Advocacy Citation of Merit, Docomomo US
Miami Marine Stadium
Miami Marine Stadium
Miami Marine Stadium

After Hurricane Andrew in 1992, the City of Miami closed the Miami Marine Stadium because of safety concerns. The building remained unused for seventeen years and continued to suffer exposure to weather and coastal chlorides. Eventually, the Friends of Miami Marine Stadium conducted a national search for an engineering firm to determine requirements and costs for structural repairs. They selected SGH based on our experience with the structure and our expertise in preservation technology, assessment and repair of concrete structures, and structural analysis.

Scope | Solutions

Designed by Hilario Candela, the building opened in 1963. Its distinctive roof consists of eight hyperbolic paraboloid shells that cantilever more than 60 ft beyond interior columns.

Following Hurricane Andrew in 1992, SGH’s services included the following:

  • Worked with the City’s insurance carrier to investigate the extent and cause of damage

  • Determined the age of the cracks and properties of the concrete through microscopic and petrographic examination of samples

  • Checked the magnitude of stress under normal and storm conditions using finite element analyses

Subsequently in 2009, to support the Friends of Miami Marine Stadium’s preservation efforts, SGH’s services included the following:

  • Conducted condition surveys of structural components

  • Performed concrete petrographic analyses, chloride content testing, and carbonation testing in our in-house laboratory

  • Concluded that rehabilitation was technically feasible

  • Developed conceptual details and estimated the cost of concrete repairs and protection measures

Project Contact(s)