Prior to our work on the marquee, SGH assisted MCCA with a major waterproofing and drainage project. In concert with our other waterproofing work on the elevated concrete ring road, traffic ramps, and plaza, SGH investigated leakage and designed waterproofing and expansion joint repairs around the marquee. Our design addressed differential movement between numerous structures, including a condition where the plaza deck structure and slab cantilever over the siphonic roof drainage tank, pedestrian tunnel, and Summer Street bridge abutments below the plaza deck.
For the marquee project, SGH led a team of four subconsultants, including Utile, Inc. Highlights of our work include the following:
Developed conceptual tower schemes ranging from dramatic counterbalanced steel support towers to minimalist braced frames
Designed the marquee structure, including the following components:
Large steel plate girders as the marquee base supported on the elevated plaza structure
Architectural concrete base plinth acting as a seating area and support to a lower lighting grid
Round structural steel tubes designed as moment frames within the exposed tower structure
Connections from the displays to the tower structure
Edge finish materials around displays and on the rear of the marquee
Tested clips in SGH’s laboratory used to hang metal digital display support grids over the sidewalk