Thornton, CO
Thornton Natatorium
Scope/Solutions
The Thorton recreation complex includes a gymnasium, racket ball court, and a natatorium with two large pools and spa. The north masonry exterior wall of the natatorium was experiencing severe efflorescence and while the relative humidity in the natatorium was low, condensation was occurring in the exterior walls. SGH investigated the cause of the building enclosure issues.
Highlights of SGH’s work on this project include the following:
- Performed water testing to recreate leaks and disassembled roof and wall sections to understand the construction details
- Concluded that deficiencies in the natatorium roof air barrier and seal allowed moist pool air to flow into the cavity of the brick masonry wall and through the roofing causing mildew growth within the roof system, which is composed of asphalt shingles in sloped areas and a ballasted rubber membrane in flat areas
- Designed new roof system with a structural air/vapor barrier, thermally broken structural blocking, and venting for a cavity space under shingles
- Determined that deficiencies in air barrier construction and in the various mechanical systems caused a positive air pressure condition that contributed to moisture problems
- Prepared plans and specifications for repairs and provided full-time monitoring during construction
- Provided technical support to the owner to assist in recovering damages
Project Summary
Solutions
Repair & Rehabilitation
Services
Building Enclosures | Applied Science & Research
Markets
Culture & Entertainment
Client(s)
City of Thornton, CO
Specialized Capabilities
Building Science | Roofing & Waterproofing | Environmental Simulations
Key team members


Additional Projects
West
Great Wolf Lodge
As California’s first indoor water park in the Anaheim area, the twelve-acre Great Wolf Lodge resort offers more than 600 hotel rooms and a three-acre waterpark. SGH consulted on the building enclosure design for the resort, which features water slides transitioning from inside to outside.
West
House of the Future
In 1954, the Monsanto Chemical Company provided funding to MIT’s Plastics Research Laboratory to develop a futuristic house made of plastics. SGH was the structural engineer for the House of the Future, which featured four symmetric wings cantilevered off a central core.