Boston, MA
Residence Inn Back Bay-Fenway
Scope/Solutions
Located near Fenway Park and Kenmore Square, Residence Inn Back Bay-Fenway is a 175-room, extended-stay hotel. The 117,000 sq ft, eight-story building includes below-grade parking, ground-floor retail, an indoor swimming pool, and a rooftop terrace. SGH consulted on the building enclosure design.
SGH assisted with designing the building enclosure, including below-grade waterproofing, wall and fenestration systems, terrace and balcony waterproofing, and roofing. Highlights of our work include the following:
- Reviewing the enclosure design and providing recommendations to improve performance
- Developing details to integrate the various enclosure systems
- Reviewing the design for interior walls separating dissimilar environments, including the indoor pool enclosure
- Evaluating and establishing criteria for heat flow, vapor diffusion, air leakage, and waterproofing
- Calculating as-designed exterior wall assembly U-Factors for energy code compliance
- Providing construction administration services, including reviewing contractor submittals, shop drawings, and requests for information about the building enclosure and visiting the site to review construction progress to compare with the design intent
- Conducting field air and water infiltration testing of curtain wall systems
Project Summary
Solutions
New Construction
Services
Building Enclosures | Performance & Code Consulting
Markets
Commercial
Client(s)
Group One Partners, Inc.
Specialized Capabilities
Building Science | Roofing & Waterproofing | Energy & Sustainability
Key team members


Additional Projects
Northeast
Omni Boston Hotel at the Seaport
Located near and connected to the Boston Convention and Exhibition Center via an underground tunnel, the new Omni Boston Hotel at the Seaport includes more than 1,000 rooms. SGH provided building enclosure consulting and commissioning services for the project.
Northeast
Dow Jones & Company
The administration building (Building #4) at the campus of Dow Jones & Company was erected between 1979 and 1981. Shortly after construction, occupants observed water leakage at the walls. SGH investigated the leakage and developed a remedial plan for the office building.