Muskegon, WI

Muskegon County Wastewater Management System

Scope/Solutions

The Muskegon County Wastewater Management System’s pipeline is an 11 mi, 66 in. dia. prestressed concrete cylinder pipe (PCCP) that carries raw domestic and industrial sewage. SGH investigated the failure of a 20 ft pipe segment, performed a condition assessment of the entire line, and proposed replacement for a section of the pipeline.

SGH performed a condition assessment of the line while in service and proposed and designed repair and replacement of a high-risk section the line. Our investigation included field inspection of the failure site, analysis of stresses in the pipeline, mechanical and metallurgical testing of the prestressing wire and the steel cylinder, electron microscopy of fracture surfaces of wire, petrographic examination of the mortar coating, and chemical analysis of the soil and groundwater.

We determined that failure was the result of a loss of prestress due to hydrogen-embrittled wire near an active corrosion cell, followed by external corrosion and rupture of the steel cylinder. SGH evaluated the risk of pipe rupture and identified a section to be replaced with steel pipe.

SGH evaluated the steel pipe design and interconnection design. We also provided engineering services during live tapping and interconnection construction.

Project Summary

Icon: completion-date

2005

Completion Date
Solutions
Failure Investigation
Services
Advanced Analysis | Applied Science & Research
Markets
Infrastructure & Transportation
Client(s)
Prein & Newhof
Specialized Capabilities
Buried Infrastructure | Failure Analysis | Microscopy

Key team members

Mehdi Zarghamee
Consulting Principal
Rasko Ojdrovic
Senior Principal

Additional Projects

Midwest

Union Station Transit Center

Led by the Chicago Department of Transportation, the Union Station Transit Center project creates an off-street Chicago Transit Authority (CTA) bus terminal adjacent to Chicago’s bustling Union Station. The transit center allows commuter rail and Amtrak train passengers to directly connect to CTA buses through an underground walkway. Working as a subconsultant to the bus canopy and curtain wall subcontractor, SGH served as the structural engineer of record to design and detail the canopy superstructures.
Explore
Midwest

Fountain View on the Plaza Garage

Fountain View on the Plaza in Kansas City includes two parking garages, Garage A and Garage B constructed in 1999. The original owner retained SGH to investigate the cause and structural implications of unusual cracking of the slabs. The subsequent owner retained SGH to design the remedial work.