Allston, MA

Harvard University Science Complex, MWRA Sewer

Scope/Solutions

Harvard University planned to locate a new science complex above a Massachusetts Water Resources Authority (MWRA) brick masonry pipeline that was over 115 years old. The University was concerned about the impact of construction on the 69 in. high by 62 in. wide active masonry sewer. SGH studied the potential effects of ground displacement that can distort and increase soil loads on buried structures, construction traffic live loads, surface vibrations, and impacts from falling objects.

Highlights of SGH’s work to assess pipeline response to construction-induced vibration and movement include the following:

  • Examined the sequences of both Boston blue clay excavation and installation and tensioning of a tie-back system
  • Used ABACUS Explicit to develop three-dimensional soil-structure interaction models
  • Analyzed stress-wave propagation through the soil
  • Assessed the extent of ground displacement
  • Modeled construction of the slurry wall adjacent to the pipe using nonlinear finite-element soil-structure interaction analysis
  • Used different nonlinear soil models, such as Mohr-Coulomb in ABAQUS, to simulate the soil layers, buried and above-grade structures, and construction processes
  • Collaborated with the owner, contractor, and other consultants, enabling Harvard to proceed with the project without endangering the pipeline

To minimize impact, the design of the four-building research complex wraps around the pipeline.

Project Summary

Icon: completion-date

2011

Completion Date
Solutions
Repair & Rehabilitation
Services
Advanced Analysis
Markets
Infrastructure & Transportation
Client(s)
Sea Consultants, Inc.
Specialized Capabilities
Buried Infrastructure | Computational Mechanics

Key team members

Mehdi Zarghamee
Consulting Principal
Daniel Valentine
Senior Project Manager

Additional Projects

Northeast

Massachusetts Water Resource Authority, Beacon Street Line

Constructed in the 1870s, the Beacon Street Line carries water under the MBTA Green Line tracks in the busy Brookline neighborhood. SGH evaluated the pipe to determine if workers could safely enter, designed the repair, and provided engineering support during construction.
Explore
Northeast

Tuskegee Airmen (formerly 100th Street) Bus Depot

The contractor attempted to repair the 280,000 sq ft of elevated decks and ramps, but subsequent cracking, including some through the previous repairs, raised concern about the service life of the depot. SGH investigated the cause of cracking in the concrete slabs.
Explore