Waltham, MA

275 Wyman Street

Scope/Solutions

Replacing a 1964 structure in Hobbs Brook Office Park, the new development at 275 Wyman Street offers approximately 300,000 sq ft of office space and parking for more than 1,000 cars. SGH was the structural engineer for the five-story office building, plaza structure, and parking garage, and also consulted on the building enclosure and plaza waterproofing.

SGH designed the structure for the steel-framed office building, adjacent precast concrete parking garage, and plaza with a below-grade parking area that connects the single level of parking below the building to the garage. SGH also consulted on the building enclosure, including curtain walls, terra-cotta cladding, and plaza waterproofing. Highlights of our work include the following:

Office Building and Plaza Design

  • Base building structure and foundations to support flexible office layouts
  • Plaza structure with covered walkway and landscape features over below-grade parking
  • Structural alterations for tenant features
  • Cantilevered, galvanized steel entrance canopies

Parking Garage Design

  • Precast concrete structure, including gravity- and lateral-load-resisting systems, foundations, and support systems for the facade
  • Floor and drainage profiles
  • Steel framing for the roof-mounted solar array

Building Enclosure Consulting

  • Evaluated the proposed enclosure design and provided recommendations to improve performance
  • Reviewed building enclosure submittals to compare with the design intent
  • Observed ongoing construction to compare with the project documents
  • Performed field air and water infiltration testing of the curtain wall and observed flood testing of the plaza waterproofing to compare with performance expectations

Project Summary

Icon: completion-date

2015

Completion Date
Icon: award-winner

AWARD

Winner
Icon: certification

LEED

Certification
Solutions
New Construction
Services
Building Enclosures | Structures
Markets
Commercial | Infrastructure & Transportation
Client(s)
Margulies Perruzzi Architects | Columbia Construction Company
Specialized Capabilities
Building Design | Facades & Glazing | Roofing & Waterproofing

Key team members

Sal Capobianco
Senior Principal
Michael Louis
Senior Principal

Additional Projects

Northeast

Education First

Once the site of an old rail yard and industrial buildings, the NorthPoint redevelopment now houses modern residential and office towers and the associated amenities. SGH consulted on the building enclosure design for the waterfall feature.
Explore
Northeast

Galvanic Testing of Materials

Contact between dissimilar metals can lead to accelerated deterioration due to galvanic corrosion. SGH is conducting ongoing, long-term testing on combinations of metals and metallic coatings to evaluate the severity of galvanic corrosion and the potential for staining.
Explore