Waltham, MA
Reservoir Woods Parking Garage
Scope/Solutions
The owner of Reservoir Woods sought to provide additional parking space in a new garage, which consists of a basement level and four elevated parking levels with 923 parking spaces. We provided project management, coordination, and structural engineering services for the 280,000 sq ft garage.
As the prime consultant for the project, we coordinated the architectural, structural, civil, mechanical, electrical, plumbing, and fire projection disciplines. Highlights of our work include the following:
- Structural design of the precast concrete superstructure supported on cast-in-place concrete spread footings
- Structural design of two exterior stair/elevator towers and a pedestrian bridge, which provides sheltered access to adjacent office building
- Functional design for garage circulation and access
Project Summary
Solutions
New Construction
Services
Structures
Markets
Infrastructure & Transportation
Specialized Capabilities
Building Design
Key team members

Additional Projects
Northeast
Riverside Park Pedestrian Bridge No. P34
The bridge carries a pathway over the Charles River in Riverside Park, which is operated and maintained by the Department of Conservation and Recreation (DCR). SGH assessed the condition of the circa 1915 pony-truss bridge and was the engineer of record for the rehabilitation.
Northeast
Government Center Station
Although the station was modified many times since opening in 1898, Government Center Station lacked accessibility. SGH designed temporary support of the existing structure during partial demolition and construction.