Providence, RI

Providence Place Mall Parking Garages

Scope/Solutions

The Providence Place Mall opened in 1999 with two parking structures named Cityside and Stateside.  The two garages are multi-level precast concrete structures adjoining the mall.  The garages exhibited chronic, premature cracking and spalling of the concrete around precast double-tee flange-to-flange connections as well as other common parking structure deterioration and distress.  SGH assessed the condition of the garages and designed remedial work.

Our condition assessment included the following scope of work:

  • Review of structural and architectural design drawings and specifications and of previous condition assessments and repairs
  • Visual survey and sounding of the parking decks
  • Observations at exploratory openings at double-tee flange-to-flange connections

SGH determined the cracking and spalling at the flange-to-flange connections was due to prying action under heavier-than-anticipated wheel loads.  We developed an innovative connection repair detail that eliminates the prying action and prevents cracking and spalling of the repaired connections.

We also developed alternatives for repair and protection of the parking decks, helped the owner select the most suitable alternative, prepared construction documents suitable for bidding and construction, and provided construction administration services that included developing construction phasing that minimized disruption of normal garage/mall operations.

Project Summary

Icon: completion-date

2008

Completion Date
Solutions
Repair & Rehabilitation
Services
Structures
Markets
Infrastructure & Transportation
Client(s)
General Growth Properties, Inc.
Specialized Capabilities
Repair & Strengthening

Key team members

Michael Brainerd
PaulMillette
Paul Millette
Senior Project Supervisor

Additional Projects

Northeast

Railroad Bridge over Otter Creek

SGH helped them by evaluating an alternate design and construction sequence to allow them to complete the project with limited weekend shutdowns of the railroad operations.
Explore
Northeast

Shore Line Bridge Replacement

SGH assisted the contractor, Barletta Heavy Division (Barletta), by providing construction engineering services to facilitate removing and replacing the bridge with a new steel through-girder bridge.
Explore