Cambridge, MA

Novartis Institutes for BioMedical Research, 250 Massachusetts Avenue

Scope/Solutions

Novartis adapted the former Necco Candy factory into a biomedical research facility and office space. The facility consists of two interconnected buildings, both of which have a concrete frame and masonry cladding. One building has limestone and brick cladding over the concrete frame while the other has an exposed concrete frame with brick infill. Since Novartis’s occupation of the building in early 2000s, they have had continued problems with spalling and deterioration of the concrete frame and leakage into the interior.

SGH investigated the causes of deterioration and leakage, and designed comprehensive repairs to the facade, including rebuilding portions of the facade to address leakage and corrosion of embedded anchors and lintels. For this project, we:

  • Conducted a concrete facade survey, including review of embedded steel depths, depth of carbonation, and review of previously applied coating.
  • Performed water testing of windows and facades to determine paths of leakage.
  • Recommended temporary make-safe repairs.
  • Designed permanent facade repairs, including rebuilding of spandrel brick areas as cavity wall systems, replacement of corroding lintels, rebuilding of parapets, and patching and recoating of concrete. Our repair design allowed work to be performed from the exterior so that the building remained 100% occupied during construction.
  • Oversaw mock-up of proposed repairs in two locations to determine feasibility and occupant disruption and reviewed mock-ups with local historic commission.

The first phase of construction is complete and we are currently performing construction administration services for second phase.

Project Summary

Solutions
Repair & Rehabilitation | Preservation
Services
Building Enclosures | Structures | Applied Science & Research
Markets
Commercial
Client(s)
Novartis AG
Specialized Capabilities
Repair & Strengthening | Condition Assessments | Preservation | Environmental Simulations | Materials Science

Key team members

Susan Knack-Brown
Managing Principal, Building Technology, Boston

Additional Projects

Northeast

303 Congress Street

The six-story, steel-moment framed building at 303 Congress Street was constructed in 1983. In 1995, SGH investigated foundation settlement that caused significant damage and resulted in immediate evacuation of the building.
Explore
Northeast

75 State Street

The use of gold leaf in Boston dates back nearly 300 years. This material, however, was untried and unproven on a large scale for modern buildings until the construction of 75 State Street in the late 1980s. SGH evaluated the technology and its applicability to the granite for the building.
Explore