The Owens Dry Lake Project was initiated to flood the surface of a dry lake as dust blowing off the surface of the lake was the source of significant caustic contaminants and presented a health hazard. A network of irrigation pipes was needed to distribute water over the large surface area. SGH evaluated the pipe and provided recommendations.

Given the severe soil conditions, fiberglass pipe was selected for the project. We analyzed several different soil stiffness categories at two compaction levels, as defined in Manual M45 (AWWA, 1996) and also reviewed the contractor’s proposed construction procedures. Our analysis indicated that a 9 psi (62 kPa) stiffness pipe could just meet the requirements of the design method presented in Manual M45. Based on experience with low stiffness pipe in wet and variable conditions like those on this project, we recommended that 18 psi (124 kPa) stiffness pipe was more appropriate for the project.  SGH specified a system for monitoring and controlling the installation quality without specifying means and methods of construction. Measurements of deflection and flattening demonstrated that the installation met the performance requirements and the pipe is performing well.

Project Summary

Icon: completion-date

2001

Completion Date
Solutions
Repair & Rehabilitation
Services
Advanced Analysis
Markets
Infrastructure & Transportation
Client(s)
Ameron International
Specialized Capabilities
Buried Infrastructure

Key team members

Additional Projects

West

Bay Area Rapid Transit, Earthquake Safety Program

Carrying about 360,000 commuters every day, Bay Area Rapid Transit (BART) is an important part of the region’s transportation infrastructure. Under a term contract, SGH performed seismic assessments and assisted with upgrading this critical transit system.