Cheyenne, WA

Cheyenne Water Distribution System

Scope/Solutions

The water distribution system in Cheyenne includes four prestressed concrete cylinder pipelines (PCCP), approximately 13.5 mi long. The 16 to 30 in. dia., lined-cylinder pipes (LCP) were installed between 1950 and 1962. Three of the PCCP carry raw and treated water, and the fourth is a part of the distribution system. SGH assessed the condition of all four lines while they remained in service.

Highlights of SGH’s work include the following:

  • Data collection and review of historical records
  • Corrosion survey including electromagnetic conductivity testing
  • Geotechnical and groundwater investigations
  • External test-pit inspection of pipe
  • Testing of mortar coating and prestressing wire samples
  • Hydraulic transient analysis
  • Structural evaluation of LCP
  • Failure risk analysis of pipe assuming broken prestressing wires and corroded steel cylinder

We found that the lines had performed well, and there were no systematic factors that presented a significant risk of future failure.

Project Summary

Icon: completion-date

2003

Completion Date
Solutions
Repair & Rehabilitation
Services
Advanced Analysis | Applied Science & Research
Markets
Infrastructure & Transportation
Client(s)
Cheyenne Board of Public Utilities
Specialized Capabilities
Buried Infrastructure | Risk & Resilience Assessment | Materials Science

Key team members

Rasko Ojdrovic
Senior Principal
Mehdi Zarghamee
Consulting Principal

Additional Projects

West

Natgun Water Storage Tanks

SGH developed a seismic design procedure for the domes and peer reviewed the tank designs. We used the procedure to design a number of tanks constructed in high seismic regions.
Explore
West

NuStar Marine Oil Terminal

SGH successfully demonstrated the adequacy of the shared 1950s wharf to safely support new oil transfer operations and developed a design for the new terminal accepted by the California State Lands Commission.
Explore