Chicago, IL
Capital One Cafe, Hyde Park
Scope/Solutions
With its new cafés, Capital One offers banking services in a fun, community coffee shop setting. The design for the Hyde Park café brings this experience to Chicago’s South Side along the rejuvenated 53rd Street corridor. The project includes a 4,500 sq ft renovation in an existing early-1900s masonry and timber-framed building clad with white and green glazed brick and terra cotta. SGH was the structural engineer of record for the project.
Highlights of our work include the following:
- Evaluating the existing floor framing for new ATMs and temporary construction loads
- Designing new steel framing to support a new moving glass partition and at openings in existing masonry walls for large bifold windows and doors
- Providing conceptual shoring details for removing an existing masonry wall
- Performing water testing to identify sources for water leakage through the masonry wall systems and to confirm the effectiveness of completed repairs
- Designing new steel anchors and lintels to support salvaged terra cotta moulding between the new bifold windows and existing ribbon windows
- Strengthening timber framing for new floor drain openings
Project Summary
Solutions
New Construction | Repair & Rehabilitation
Services
Building Enclosures | Structures | Applied Science & Research
Markets
Commercial
Client(s)
IA Interior Architects | Bulley & Andrews, LLC
Specialized Capabilities
Building Design | Temporary Construction | Condition Assessments | Environmental Simulations
Key team members
Additional Projects
Midwest
30 East Balbo Drive
Targeting college students and young professionals in Chicago’s South Loop, 30 East offers 255 bedroom rentals in 134 shared, furnished apartments. The sleek glass enclosure reflects 30 East’s modern take on rental living. SGH consulted on the design of the building’s glazing and wall systems.
Midwest
Hyatt Lodge at McDonald’s Campus
Hotel personnel observed the protective coating peeling, the intumescent material activating, and water leaking into the vestibule. SGH investigated the cause of the intumescent failure, developed repair documents, and oversaw the repairs.