Stockton, CA

NuStar Marine Oil Terminal

Scope/Solutions

Stockton Berth 10/11 supports heavy lift, container, general cargo, and dry bulk operations. NuStar Energy wanted to upgrade the existing facility to create a new MOTEMS-compliant marine oil terminal at the multi-use berth, but introducing liquid bulk transfer operations to an existing wharf made this project a first of its kind. SGH successfully demonstrated the adequacy of the shared 1950s wharf to safely support new oil transfer operations and developed a design for the new terminal accepted by the California State Lands Commission.

SGH performed nonlinear structural analyses to demonstrate that the existing wharf’s structural and seismic capacity was adequate to support the proposed use.
We consulted on the structural, mechanical, and process design for the new marine oil terminal. Our work included developing initial concepts and project scoping, designing marine structures and infrastructure, designing new oil transfer and fire suppression systems, and assisting with regulatory compliance planning for marine oil terminal operations. Highlights of our design for the new terminal include:

  • Buried vaults housing critical oil transfer equipment capable of supporting large live loads when closed and not in use
  • A MOTEMS-compliant fire suppression system that is resilient to cargo handling operations and heavy equipment operating on the wharf
  • Quick-release mooring hooks
  • A portable, floating fender system for oil tankers and barges

By effectively demonstrating the existing 1950 wharf only required minor improvements to safely support liquid bulk transfer operations, SGH was able to help NuStar Energy avoid constructing all new marine infrastructure.

Project Summary

Icon: completion-date

2022

Completion Date
Solutions
New Construction
Services
Structures
Markets
Infrastructure & Transportation
Client(s)
NuStar Energy LP
Specialized Capabilities
Marine & Civil Works

Key team members

Will Bruin
William Bruin
Executive Principal, Structural Engineering, West

Additional Projects

West

Greybull Water Transmission Pipeline

The Greybull Water Transmission Pipeline is the only pipeline that carries treated water for the town of Greybull. SGH performed a condition assessment of this pipeline as a part of the town’s maintenance program.
Explore
West

Port of San Francisco On-Call Engineering

In 2019, the Port Commission awarded four-year agreements for as-needed engineering and related services to help them with various projects at the Port of San Francisco. Working with Terra Engineers, SGH served as the structural and building enclosure engineering lead for their team's projects.
Explore