South
Comanche Peak Nuclear Power Plant, Units 3 & 4
SGH designed Seismic Category I structures at the Comanche Peak nuclear facility for preparation of Combined Operating License Application. SGH analyzed the original structural configuration and seismic input, and reanalyzed and designed them four years later with revised geometry and loading.

