South
Precast Concrete Arch
A precast concrete arch allowed mine vehicles to pass over U.S. Highway 191. A few months after the buried bridge was put into service, the mine operator observed separation of the headwall panels and longitudinal cracks in the highway. They retained SGH to investigate the bridge's condition.


