SGH evaluated the existing structure to determine whether it could support the equipment proposed for the second floor and roof. We determined the renovations were structurally feasible and designed the following:
-
Chamber platform framing to support the primary cold spray system and strategically transfer loads to the existing second floor framing
-
Isolation details designed in coordination with a vibration and acoustics consultant to limit disturbance from certain equipment to surrounding laboratory spaces
-
Steel dunnage to support rooftop mechanical systems and accommodate future expansion
-
Framing around new floor and roof openings for mechanical chases between the second-floor laboratory and the rooftop units
-
A steel-framed rack system to support horizontal runs of piping and ductwork between the building and an adjacent storage container for helium tanks, nitrogen tanks, and other laboratory operation support systems
SGH provided construction administration services, including reviewing contractor submittals, observing ongoing work to compare with the design intent, and helping the contractor address unforeseen field conditions.