Winchester, MA

Winchester Hospital Parking Garage

Scope/Solutions

The parking garage at Winchester Hospital was constructed in 1982 and is used heavily during the day by patients and visitors. The concrete structure, primarily comprising precast double-tees, beams, and columns, exhibited cracking and spalling. SGH investigated the structure’s condition and designed repairs to extend its useful life.

SGH determined the structure required remedial work to address corrosion‑related deterioration and designed repairs, including:

  • Full-depth repairs to precast double tee flanges
  • Partial-depth repairs to precast inverted tee beams supporting the double-tees, precast concrete columns, and cast-in-place concrete curbs
  • Repairs to deteriorated plumbing components

We helped Winchester Hospital coordinate scheduling and implement the project in phases, allowing the garage to remain open during the work.

Project Summary

Solutions
Repair & Rehabilitation
Services
Structures
Markets
Health Care & Life Sciences | Infrastructure & Transportation
Client(s)
Winchester Hospital
Specialized Capabilities
Repair & Strengthening

Key team members

Sal Capobianco
Senior Principal

Additional Projects

Northeast

Boynton Yards, 101 South Street

101 South Street is the first purpose-built, Class A laboratory building in Somerville. SGH consulted on the building enclosure design and provided building enclosure commissioning services for a new nine-story laboratory and office building at 101 South Street.
Explore
Northeast

John R. Oishei Children’s Hospital

The 185-bed John R. Oishei Children’s Hospital replaces the city’s 125-year-old Women and Children’s Hospital of Buffalo. SGH was the structural engineer for the project, including the structures for signage, and designed below-grade waterproofing for the tunnel.
Explore