The parking garage at Winchester Hospital was constructed in 1982 and is used heavily during the day by patients and visitors. The concrete structure, primarily comprising precast double-tees, beams, and columns, exhibited cracking and spalling. SGH investigated the structure’s condition and designed repairs to extend its useful life.
SGH determined the structure required remedial work to address corrosion‑related deterioration and designed repairs, including:
- Full-depth repairs to precast double tee flanges
- Partial-depth repairs to precast inverted tee beams supporting the double-tees, precast concrete columns, and cast-in-place concrete curbs
- Repairs to deteriorated plumbing components
We helped Winchester Hospital coordinate scheduling and implement the project in phases, allowing the garage to remain open during the work.
Project Summary
Solutions
Repair & Rehabilitation
Services
Structures
Markets
Health Care & Life Sciences | Infrastructure & Transportation
Client(s)
Winchester Hospital
Specialized Capabilities
Repair & Strengthening
Key team members
Additional Projects
Northeast
Worcester Recovery Center and Hospital
The Massachusetts Department of Mental Health wanted to expand their treatment resources with a new hospital facility. SGH consulted on the flooring assemblies’ design and installation to help achieve long-term performance, since access to this area would be restricted after it is put in service.
Northeast
St. Elizabeth’s Medical Center, William F. Connell Pavilion
SGH was the structural engineer of record for the project and consulted on aspects of the building enclosure.