The Museum of Science parking garage was built in two phases in the late 1960s and partially spans the Charles River. After thirty years of exposure to weather and vehicles, chlorides from deicing salts permeated the top surface of the concrete slabs. Working for the owner, SGH assessed the condition of the concrete garage and recommended a rehabilitation program to extend the useful life of the structure.
The five-level parking structure has an approximate gross area of 68,000 sq ft per level. The garage is a combination of precast, prestressed concrete elements and cast-in-place, post-tensioned concrete elements. Our services included the following:
- Determined the condition of the garage through a hands-on investigation
- Examined the condition of the concrete
- Evaluated the extent of chloride contamination from deicing salts typically brought into the garage by vehicles
- Identified and prioritized remedial work to repair deterioration, control leakage, and extend the useful life of the garage
- Estimated costs for the remedial work
Project Summary
Solutions
Repair & Rehabilitation
Services
Structures | Applied Science & Research
Markets
Infrastructure & Transportation
Client(s)
Museum of Science
Specialized Capabilities
Repair & Strengthening | Materials Science
Additional Projects
Northeast
333 Glen Street Parking Garage
The new garage located at 333 Glen Street adds 287 parking spaces in structured parking for the adjacent office building. We were the prime consultant, structural engineer of record, and precast piece designer for the 92,000 sq ft parking garage.
Northeast
Columbia Street Parking Garage
The owner of the Columbia Street Parking Garage needed a cost-effective design to replace the deteriorated precast concrete structure. SGH was the prime consultant, structural engineer, functional designer and precast concrete specialty engineer for the new structure.