The Museum of Science parking garage was built in two phases in the late 1960s and partially spans the Charles River. After thirty years of exposure to weather and vehicles, chlorides from deicing salts permeated the top surface of the concrete slabs. Working for the owner, SGH assessed the condition of the concrete garage and recommended a rehabilitation program to extend the useful life of the structure.
The five-level parking structure has an approximate gross area of 68,000 sq ft per level. The garage is a combination of precast, prestressed concrete elements and cast-in-place, post-tensioned concrete elements. Our services included the following:
- Determined the condition of the garage through a hands-on investigation
- Examined the condition of the concrete
- Evaluated the extent of chloride contamination from deicing salts typically brought into the garage by vehicles
- Identified and prioritized remedial work to repair deterioration, control leakage, and extend the useful life of the garage
- Estimated costs for the remedial work
Project Summary
Solutions
Repair & Rehabilitation
Services
Structures | Applied Science & Research
Markets
Infrastructure & Transportation
Client(s)
Museum of Science
Specialized Capabilities
Repair & Strengthening | Materials Science
Additional Projects
Northeast
Pan Am Southern Connecticut River Main Line, Masonry Arch Bridges
As part of this project, SGH assisted HNTB Corporation (HNTB) with their assessment of eight masonry arch bridge structures along and/or supporting the railway in consideration of planned construction for new rails and tracks.
Northeast
Massachusetts Bay Transportation Authority, Charles/MGH Station
As part of the complete rebuilding and reconfiguring of the station, the contractor needed to remove an existing pier supporting the viaduct. SGH designed a load-transfer system that could be installed and utilized within the single weekend shutdown permitted by the MBTA.