Mid-Atlantic
Fort Belvoir, New Campus East
Working with the joint venture of Clark/Balfour Beatty, SGH consulted on the building enclosure design and construction.
Winchester, VA
Scope/Solutions
The Federal Bureau of Investigation needed space to house and automate the storage of their extensive file collection. The new Central Records Complex will house more than two billion pages, which will be filed and retrieved by a team of robots. SGH consulted on the building enclosure for the design-build project, led by Clark Construction Group.
SGH consulted on the building enclosure design, including exterior walls clad with architectural precast concrete panels at the first- and second-floor levels and rainscreen metal panels at the penthouse level, aluminum-framed curtain wall in punched openings, ribbon windows, and low-slope roofing. Highlights of our work include the following:
Project Summary