Boston, MA
Back Bay Hilton Parking Garage
Scope/Solutions
The 300-car Back Bay Hilton parking garage was built in 1981. Cambridge Seven Associates retained SGH to assess the condition of the parking decks and develop alternatives to repair existing distress and deterioration, control leakage, and extend the useful life of the garage.
SGH performed a condition assessment of the seven-level, 100,000 sq ft structure. Our work for the cast-in-place parking garage with post-tensioned concrete slabs, beams, and girders, included the following:
- A condition survey of the elevated parking decks to document the approximate location and extent of deterioration, distress, leakage, and previous repairs
- Observations at exploratory openings throughout the parking decks to document the condition of the slab post-tensioning and mild steel reinforcement
- A pachometer survey to spot check the placement and cover over reinforcement
- Petrographic examination and chloride content tests on extracted core samples
- Calculations to spot-check the load carrying capacity of a representative portion of parking deck slab
- Development of remedial work alternatives
- Cost estimates for rehabilitation and maintenance
Project Summary
Solutions
Repair & Rehabilitation
Services
Structures | Applied Science & Research
Markets
Commercial
Client(s)
Cambridge Seven Associates
Specialized Capabilities
Repair & Strengthening | Materials Science | Microscopy
Additional Projects
Northeast
66 Galen Street, Watertown, MA
SGH consulted on building enclosure design for the building, featuring a variety of facade systems, including a curved curtain wall along the river-facing elevation, a green-roof terrace, and a membrane roof covered with a photovoltaic array.
Northeast
The Point LIC, Blanchard
The Point LIC, a new commercial development, reinvents two, seven-story industrial buildings as the Paragon and Blanchard. SGH provided building enclosure and structural services for the project.