Boston, MA
Museum of Science Parking Garage
Scope/Solutions
The Museum of Science parking garage was built in two phases in the late 1960s and partially spans the Charles River. After thirty years of exposure to weather and vehicles, chlorides from deicing salts permeated the top surface of the concrete slabs. Working for the owner, SGH assessed the condition of the concrete garage and recommended a rehabilitation program to extend the useful life of the structure.
The five-level parking structure has an approximate gross area of 68,000 sq ft per level. The garage is a combination of precast, prestressed concrete elements and cast-in-place, post-tensioned concrete elements. Our services included the following:
- Determined the condition of the garage through a hands-on investigation
- Examined the condition of the concrete
- Evaluated the extent of chloride contamination from deicing salts typically brought into the garage by vehicles
- Identified and prioritized remedial work to repair deterioration, control leakage, and extend the useful life of the garage
- Estimated costs for the remedial work
Project Summary
Solutions
Repair & Rehabilitation
Services
Structures | Applied Science & Research
Markets
Infrastructure & Transportation
Client(s)
Museum of Science
Specialized Capabilities
Repair & Strengthening | Materials Science
Additional Projects
Northeast
MBTA Kenmore Square Bus Station Canopy
The Kenmore Station Bus Canopy, designed by architect DiMella Shaffer, is part of the Kenmore Square Public Improvements Project. SGH performed a detailed review of the structural glass design and provided guidance on fabrication and constructability.
Northeast
North Central Correctional Institute Steam Tunnel
Working for the utility contractor, SGH designed repairs to extend the useful life of the tunnel.