West
MBTA Park Street Station
SGH assisted the contractor by reviewing the proposed shoring requirements and suggesting alternate means and methods that allowed them to successfully accomplish the work.
San Francisco, CA
Scope/Solutions
Dedicated in 1954, the airport’s original six-story concrete structure and its air traffic control tower (ATCT) more recently became known as Terminal 2. After constructing a new ATCT in 2016, the airport undertook a project to demolish the original ATCT and Terminal 2’s upper four stories, and then build back two stories above the existing structure to provide more functional space. SGH served as the structural engineer of record for the design-build project.
Our structural design for the new levels minimized the effects on the existing structures and allowed terminal operations, including TSA screening on the second floor, to continue throughout construction. Highlights include the following:
Project Summary