Lakeville, CT

Hotchkiss School Natatorium

Scope/Solutions

The Hotchkiss School Natatorium is a competitive swimming and diving facility within a 212,000 sq ft  athletic complex. During its first winter, the owner reported problems, including brown stains and water dripping from the ceiling, efflorescence on exterior masonry, condensation on glazing systems, and heavy ice accumulation at roof eaves. The contractor originally hired SGH to determine the cause of these problems and the architect later retained us to design repairs.

Our investigation included observations at exploratory openings, water testing, air leakage tests, evaluation of infrared scans, and air pressure monitoring.

 

SGH determined warm, humid air from the natatorium was leaking into the exterior wall and roof systems; condensing on cold surfaces outboard of the insulation; and causing efflorescence, icicle formation, and water dripping. We concluded this leakage occurred because the natatorium enclosure lacked a continuous air barrier system and the mechanical system could not achieve and maintain sufficient negative air pressure in the natatorium. Additionally, SGH determined the enclosure’s thermal performance at and around windows could not accommodate the high humidity, leading to condensation on the glazing.

 

We recommended remedial work to reduce air exfiltration by improving enclosure continuity and to control indoor air pressure by modifying the mechanical system. SGH designed a new roof for the building, including the details for integrating the new roof with the existing walls. We provided part-time construction monitoring during the remedial work, which was fast-tracked to fit within the school’s prescribed time frame for repairs.

Project Summary

Icon: completion-date

2004

Completion Date
Solutions
Repair & Rehabilitation
Services
Building Enclosures
Markets
Education
Client(s)
O&G Industries | Ellerbe Becket
Specialized Capabilities
Building Science | Roofing & Waterproofing

Key team members

Vince Cammalleri
Head of Business Administration

Additional Projects

Northeast

Three-dimensionally Printed Glass Testing

In 2017, SGH collaborated with the MIT Media Lab on an exhibit for Milan Design Week. Looking to advance their research with a new geometry, MIT retained SGH to perform additional testing on 3D-printed glass samples in 2024.
Explore
Northeast

UMass Memorial Health North Pavilion

With its new acute-care facility, UMass Memorial Health adds 72 patient beds and features a garden patio on the fourth floor with views of Lake Quinsigamond. SGH provided structural engineering and building enclosure consulting and commissioning services for the project.
Explore