West
SR 520 Floating Bridge
Working with the design-build team, SGH served as the structural and marine engineer, as well as the engineer of record for many critical tasks on this project.
Greybull, WY
Scope/Solutions
The Greybull Water Transmission Pipeline is the only pipeline that carries treated water for the town of Greybull. The 16.5 mile pipeline was constructed in 1960s and 1970s with 12 in. and 14 in. dia. asbestos cement (AC) pipes. SGH performed a condition assessment of this pipeline as a part of the town’s maintenance program.
AC pipe can fail as a result of stresses and strains in the pipe wall or near joints or due to internal or external chemical degradation of material and reduction of capacities. As a part of the ongoing project, SGH:
Project Summary