Northeast
Massachusetts Institute of Technology, Yin/Yang Pavilion at Simmons Hall
As a requirement of their contract, the steel fabricator called upon SGH to provide structural engineering services for the sculpture.
Fitchburg, MA
Scope/Solutions
Originally constructed in 1963, the three-story Condike Science Building needed renovations to improve the performance and function of the facility. Fitchburg State University undertook a comprehensive renovation of the existing building and built a new 57,700 sq ft addition to house the Biology, Chemistry, Physics, and Geophysical Science departments. SGH was the Building Enclosure Commissioning Agent (BECxA) for the project.
As the BECxA, SGH performed the following work:
Project Summary