Ithaca, NY
Cornell University, Veterinary Research Tower
Scope/Solutions
The Veterinary Research Tower is a nine-story structure that was built in the 1970s, and is clad with brick veneer and curtain walls. The walls were constructed without insulation or air barriers and single-pane windows and curtain walls. Cornell University commissioned a whole building condition assessment and design concepts for making code upgrades, improving energy efficiency, and addressing other maintenance. SGH assisted the architect by assessing the building enclosure’s condition and recommending repair options.
Highlights of our work include the following:
- Conducting a facade and roof condition assessment using conventional and rope access techniques
- Performing water testing and making observations at exploratory openings
- Recommending repairs and maintenance for the windows, roofs, and facade
- Evaluating the effects of adding insulation to the brick veneer walls both from the interior and exterior using transient moisture vapor drive analysis
- Collaborating with the architect and MEP designer on whole building energy analyses by providing anticipated u-factors for both existing and proposed building enclosure components
Project Summary
Solutions
Repair & Rehabilitation | Preservation
Services
Building Enclosures | Performance & Code Consulting | Applied Science & Research
Markets
Education
Client(s)
Anshen + Allen
Specialized Capabilities
Condition Assessments | Preservation | Energy & Sustainability | Environmental Simulations
Key team members
Susan Knack-Brown
Managing Principal, Building Technology, Boston
Additional Projects
Northeast
Groton School
Groton School, founded in 1884, is a private boarding school offering curriculum for 8th to 12th grades. SGH has provided building enclosure and material science consulting services for projects at Groton School since 2002.
Northeast
Massachusetts Institute of Technology, Building 7 Dome
Building 7, also known as the Rogers Building, features a large dome with a glass block skylight over the building lobby. SGH designed a skylight rehabilitation in 2013 and later designed repairs for the dome cladding to address water leakage.




