Taiwan

Chinshan, Maanshan, and Kuosheng Nuclear Power Plants

Scope/Solutions

The Institute of Nuclear Energy Research (INER) of Taiwan retained SGH to support the new Seismic Probabilistic Risk Assessments (SPRAs) of three Nuclear Power Plants (NPP), which each use different reactor designs. The Chinshan NPP is a General Electric Mark I boiling water reactor (BWR), the Maanshan NPP is a Westinghouse pressurized water reactor, and the Kuosheng NPP is a Mark III BWR.

INER developed the Seismic Equipment Lists (SELs) identifying components to be included in SPRA. SGH performed seismic walkdowns of the items on the SELs for each plant following EPRI NP-6041-SL guidelines.

The plants were previously analyzed by deterministic seismic margin method for beyond design basis earthquake ground motion defined by a median NUREG/CR-0098 ground spectral shape anchored to 1.67 times the peak ground accelerations for the Safe Shutdown Earthquakes. The in-structure response spectra (ISRS) for the SPRAs were developed by scaling the deterministic ISRS to the preliminary uniform hazard spectra from recently updated probabilistic seismic hazard analyses.

We are currently performing seismic fragility evaluations for selected structures, systems, and components (SSCs) for each plant following methods recommended by EPRI TR-103959 and EPRI 1019200. The selected SSCs include those we judged to have potential seismic vulnerabilities by our seismic walkdowns, and those identified as being potentially risk-significant by systems reviews conducted by INER.

Project Summary

Solutions
Repair & Rehabilitation
Services
Structures | Advanced Analysis | Performance & Code Consulting
Markets
Energy
Client(s)
Atomic Energy Council's Institute of Nuclear Energy Research
Specialized Capabilities
Seismic Engineering | Nuclear | Risk & Resilience Assessment

Additional Projects

West

Columbia Generating Station, Seismic Probabilistic Risk Assessment

After the Fukushima Daiichi accident, the U.S. Nuclear Regulatory Commission (NRC) issued 10 CFR 50.54(f), a letter requiring licensees to perform a re-evaluation of seismic hazard and take further actions if it exceeds their design basis. In response to this letter, Columbia Generating Station (CGS) performed a seismic probabilistic risk assessment (SPRA) of their facility.