Northeast
Dedham Place at 3 Allied Drive Parking Garages
SGH assessed the condition of the aging parking structures and designed repairs to extend their useful life.
Boston, MA
Scope/Solutions
The elevated section of Route 203, known as the Casey Overpass or Bridge No. B-16-367, carried the Arborway over Washington and South Streets in Boston’s Jamaica Plain neighborhood. The Casey Arborway Project involved removing structurally deficient Bridge No. B-16-367 and replacing it with an on-grade roadway network. SGH assisted the demolition contractor by evaluating the effects of proposed construction loading and sequencing on the overall structural stability during demolition.
SGH worked closely with the contractor to understand their proposed demolition approach. We evaluated the following and prepared demolition plans for review by the Massachusetts Department of Transportation.
Project Summary