Boston, MA

MBTA Haymarket Tunnel Station

Scope/Solutions

A component of a major development project in downtown Boston, Massachusetts, required demolishing a portion of the Government Center garage. On 26 March 2022, three precast concrete tee beams and a construction vehicle fell to the ground from the eighth and ninth floors of the partially demolished garage, striking directly over the Haymarket Station tunnel. SGH supported the Massachusetts Bay Transportation Authority (MBTA) by identifying damage potentially caused by the collapse and analyzing the effects from the impacts on the tunnel that carries the MBTA’s Green and Orange Lines.

Immediately following the collapse, the MBTA closed Haymarket Station and the tunnels between North Station and Government Center and worked to confirm that no worker or member of the public were near the tunnels. Once it was safe to enter, SGH conducted multiple site visits to make visual observations from the topside and underside of the tunnel, and document the existing configuration of the structures and collapse debris.

We executed a multi-tiered analysis, ranging from hand calculations to detailed finite element modeling, and oversaw physical proof testing to validate our results. With service halted, the MBTA needed to promptly understand the implications of the collapse. SGH responded quickly and creatively with a pragmatic approach, leveraging field observations, analyses of varying complexity, and proof testing to give the MBTA confidence that it was safe to resume Green Line train service.

Project Summary

Icon: completion-date

2022

Completion Date
Icon: award-winner

Award

Winner
Solutions
Failure Investigation
Services
Structures | Advanced Analysis | Applied Science & Research
Markets
Infrastructure & Transportation
Client(s)
Massachusetts Bay Transportation Authority
Specialized Capabilities
Geotechnical | Failure Analysis

Key team members

Daniel Cook
Associate Principal
Paul Schuman
Principal
Norman Perkins
Director of Applied Science & Research

Additional Projects

Northeast

John W. Weeks Footbridge

As part of an on-call term contract with the Department of Conservation and Recreation (DCR) and with additional design funding provided by Harvard University, SGH worked on a two-phase project to repair and upgrade the bridge.
Explore
Northeast

Brightman Street Bridge

During the six-year rehabilitation of the Brightman Street Bridge, SGH provided investigation and concrete design services and performed testing, analysis, and thermal modeling of mass concrete placements.
Explore