Berkeley, CA
University of California, Maximino Martinez Commons
Scope/Solutions
Needing more student housing, the university undertook developing a new residence hall on Berkeley’s south side. The architects’ design, which maximizes natural light and ventilation, integrates a contemporary building with the neighboring Anna Head Historic Structures Complex. SGH assisted the architecture team with the building enclosure design.
SGH consulted on below-grade waterproofing, roofing, podium/balcony/terrace waterproofing, exterior wall cladding, and windows. Highlights of our work include the following:
- Established performance criteria for building enclosure systems and components
- Reviewed design concepts and provided recommendations to improve performance
- Developed details to integrate the various enclosure systems
- Participated in cost analysis meetings with the design team and university and helped develop alternate design concepts to balance cost and performance expectations
- Responded to questions from bidders and helped evaluate bids from contractors for the exterior wall, roofing, and waterproofing work
- Reviewed building enclosure submittals to compare with the design intent
- Visited the site to observe construction to compare with the project requirements
- Evaluated alternate details to address variations in as-built conditions
Project Summary
Solutions
New Construction
Services
Building Enclosures
Markets
Education
Client(s)
Behnisch Architekten | EHDD
Specialized Capabilities
Roofing & Waterproofing
Key team members

Additional Projects
West
UC San Diego, Canyon Vista Marketplace
The reinvented Canyon Vista Marketplace connects the dining commons, store, and student lounge areas. SGH provided fire/life safety and accessibility code consulting services for the project.
West
Richard N. Slawson Southeast Occupational Center
The Slawson Southeast Occupational Center, formerly Bell Adult Education Center, is a new job preparation facility for the Los Angeles Unified School District. SGH performed a condition assessment of the existing warehouse and was the structural engineer of record for the new center.