The 1931 building was originally known as the Southern California Edison Building and served as the company’s headquarters. The building’s new owners wanted to renovate the fourteen-story structure to update the building for modern...
Designed by Gensler, Catalog is a five-story dining, retail, and entertainment hub located at the base of the 1970s Willis Tower. The repositioning project, which redevelops 388,900 sq ft of amenity space in this Chicago icon, also includes three...
This insurance company relocated their headquarters to the Aon Center, a prominent building in Chicago’s skyline, and wanted to connect their space on the 32nd and 33rd floors with a feature stair. SGH analyzed the existing structure,...
When Keyence Corporation decided to lease additional space in the 1970s, fourteen-story building at Hamilton Lakes Business Park, they wanted to create an exciting office representing the innovative products they produce. SGH provided structural...
Through a combination of public and private investments, the 300-acre Brooklyn Navy Yard will be reinvented as a modern industrial park. Crye Precision is leading this effort as an anchor tenant for the Green Manufacturing Center in Building 128...
U.S. Cellular wanted to consolidate all Chicago-area operations, including their headquarters, into a single building where they already occupied eleven floors. SGH was the structural engineer for the renovation project, which added 120,000 ...
Designed by Sasaki for the new Boston-based headquarters of Havas/Arnold Worldwide, the interior fitout represents the edgy characteristics of the client while providing a welcoming and exciting workspace. The modern office space of the...