With over 50,000 runners in 2014, the TCS New York City Marathon is the largest marathon in the world. Turning city streets into a raceday event requires eye-catching graphics and signage. SGH evaluated the structural design for...
Let the Public Play, a project administered by the Cambridge Arts Council, brings playful environments to the city’s parks and playgrounds. As part of this project, Adam Simha, a Cambridge-based artist and metalsmith, designed Tubular Bells...
Second in Cristina Parreño's Tectonics of Transparency series, The Tower was a temporary installation on the Rose Kennedy Greenway. To align with the exhibition's infrastructure heritage theme, the glass tower served as a periscope,...
The 2015 exhibition, Bigger than a Breadbox, Smaller than a Building, featured large-scale installations in the Boston Society of Architects (BSA) Space. SGH provided structural engineering and materials science services for the three main...
The 2015 exhibition, Bigger than a Breadbox, Smaller than a Building, featured large-scale installations in the Boston Society of Architects (BSA) Space. SGH provided structural engineering and materials science services for the three main...
The 2015 exhibition, Bigger than a Breadbox, Smaller than a Building, featured large-scale installations in the Boston Society of Architects (BSA) Space. SGH provided structural engineering and materials science services for the three main...
On display at the Metropolitan Museum of Art (the Met) from May to September, the Costume Institute’s 2016 exhibit examined the balance of creating fashion both by hand and with new technology. To support the Manus x Machina exhibit, the...
In November 2016, the Harvard Graduate School of Design (GSD) announced an inaugural design-build competition for an installation in The Grove at the intersection of North Harvard Street and Western Avenue. With their winning We All design, GSD...
To honor their 150th anniversary, the Massachusetts Institute of Technology (MIT) hosted many events, including the FAST Arts Festival. The festival for art, science, and technology, showcased exciting installations throughout the campus. H?weler...
Every year, the big game requires a variety of exterior graphics and installations to transform the host venue into the Super Bowl venue. Working with the event coordinators, SGH evaluated the structural design for several large displays...
Designing for deconstruction or disassembly is an important part of green design and the closed-loop building materials cycle. Material waste produced from new construction, renovation and demolition is 25%-30% of the total waste produced each...