University of Massachusetts, Boston Harbor Campus

Boston, MA

Client

The Commonwealth of Massachusetts

Completion

2015

The UMass Boston Harbor Campus, originally constructed in the early 1970s, included five buildings. A plaza level two stories above grade interconnects these buildings and there are two substructure levels below the plaza level. The majority of the substructure was used for parking. DCAM retained SGH to conduct a study for the repair of the plaza and two substructure levels, and to design remedial work to address existing deterioration and extend the useful life of the facility.