Projects

688 Projects

Neponset River Bridge

Boston-Quincy
,
MA
Project Contacts:

Opened in 1971, Neponset River Bridge carries Morrissey Boulevard traffic over Neponset River. The superstructure consists of steel plate girders and cover-plated steel stringers supporting a 7.5...

Odd Fellows Hall

Wakefield
,
MA
Project Contacts:

Odd Fellows Hall, listed on the National Register of Historic Places, was built in the late 1800s as a manufacturing building with then-common post-and-beam interior framing and unreinforced brick...

Crom Corporation, Elevated Prestressed Concrete Water Tanks

Frankfort
,
KY
Project Contacts:

Since the early 1980s, SGH has worked with Crom Corporation to assist them in their tank designs. Crom is one of the largest manufacturers of prestressed concrete tanks in the United States. The...

California State University, Central Plant Facility

Northridge
,
CA
Project Contacts:

As part of a campus-wide infrastructure upgrade and renovation,...

Bellevue-Staten Condominiums

Oakland
,
CA
Project Contacts:

The Bellevue-Staten building was constructed in the 1920s in the Art Deco style and is on the National Register of Historic Places. The owners were concerned about the structural integrity of the...

One Cambridge Place

Cambridge
,
MA
Project Contacts:

The headquarters offices of Camp Dresser & McKee occupied two office buildings in Kendall Square. CDM wanted to consolidate offices into a single structure. The developer required the new...

Logan International Airport, West Parking, Controlled Demolition of Post-tensioned Concrete Garage and Slab

Boston
,
MA
Project Contacts:

A portion of the West Parking Garage fifth floor was cast on a snowy day. When the forms were stripped, contractor observed cracks and ice-filled voids in the slab. The owner and contractor...

University Hospitals of Cleveland

Cleveland
,
OH
Project Contacts:

This hospital facility replaced several outdated buildings and expanded the hospital's capacity and level of service. The project included the Mather Pavilion, a new six-story building with twenty...

Zurich Insurance Group, New Parking Garage

Baltimore
,
MD
Project Contacts:

Zurich’s facility improvement plan required additional parking for over 1,000 vehicles and needed the parking structure to be operational within sixteen months from the...

MWRA, Spot Pond

Stoneham
,
MA
Project Contacts:

SGH developed an emergency repair for a 48 in. dia. prestressed concrete cylinder pipeline penetrating the concrete core of the Spot Pond Dam. The pipe was cracked at the penetration point due to...

Pages